Guide · Development and project management

How do you carry out a hotel feasibility study?

The short answer

A hotel feasibility study tests whether a specific building, in a specific market, can support a specific hotel concept and repay the capital invested. It combines market and demand analysis, concept and positioning, a development budget, a five to ten year operating projection on USALI, and a return and financing analysis. Its purpose is to support a decision, not to justify one already taken.

Hotel feasibility study: stone farmhouse hotel with pool in the Italian countryside

What questions should a hotel feasibility study answer?

A serious hotel feasibility study answers four questions in sequence. Is there enough demand, at the right price, for the type of hotel proposed? Can the building physically accommodate that concept at an acceptable cost? Will the hotel generate enough operating profit once stabilised? And does that profit, capitalised or discounted, justify the total investment including acquisition, works, fees and pre opening?

If the answer to any of these is no, the study should say so clearly. The most useful studies are those that change the project: fewer rooms and a larger restaurant, a different positioning, a phased opening, or a decision not to proceed.

How do you analyse the market and demand?

Start from demand, not from the building. Identify the segments that already travel to the destination: leisure couples, families, groups, weddings, corporate and MICE, the luxury travel trade. For each, estimate seasonality, length of stay and price sensitivity. Then map the competitive set, meaning the five to ten hotels a guest would realistically compare with yours, with their positioning, room count, facilities and indicative rates across the year.

From this you build the assumptions for occupancy, rooms sold divided by rooms available, and ADR, the average daily rate per room sold. Together they give RevPAR, revenue per available room, the reference measure for comparing your projection with the market. A new hotel needs a ramp up period: in many cases first year occupancy sits well below the stabilised level, which is typically reached in the third or fourth year.

  • Demand by segment and by month, not a single annual average
  • Access, airports, seasonality of the destination and planned new supply
  • Price positioning tested against what comparable hotels achieve in shoulder months

How does a hotel feasibility study turn the concept into numbers?

The concept defines room count, room mix, food and beverage outlets, spa, event spaces and service level. Each choice has a cost and a revenue consequence. A restaurant open to the public can raise TRevPAR, total revenue per available room, but brings payroll and food cost that must be carried in low season. The hotel feasibility study should show these trade offs explicitly.

The operating projection should follow USALI, the Uniform System of Accounts for the Lodging Industry, with departmental revenues and costs, undistributed expenses and GOP, gross operating profit. Payroll is usually the largest cost line, and in upscale independent hotels it indicatively absorbs between 30 and 40 per cent of revenue. Below GOP come management fees, a reserve for FF&E replacement of typically 3 to 4 per cent of revenue once stabilised, insurance and property taxes, to arrive at EBITDA.

What does the investment side include?

The development budget must be complete: acquisition, professional fees, permits, construction, mechanical and electrical systems, FF&E (furniture, fixtures and equipment), OS&E (operating supplies and equipment), technology, pre opening costs, working capital, financing costs during construction and a contingency. Owners who compare only the construction cost with expected revenue systematically underestimate the capital required.

Returns are then tested on several measures: yield on cost at stabilisation, internal rate of return over the holding period, cash on cash return and debt service coverage. A sensitivity analysis is essential. Show what happens if ADR is 10 per cent lower, if the ramp up takes a year longer or if construction costs rise. A project that only works in the base case is fragile.

Who uses a hotel feasibility study and how is it validated?

The same document serves the owner, the bank, potential operators or brands and, where relevant, public funding applications. Each reader checks different things: the bank looks at coverage and downside, an operator at concept and market positioning. It is worth writing it once, with transparent assumptions.

Planning and regulatory matters, such as permitted use, heritage constraints and hotel classification requirements, must be verified with the owner's advisers and the local authorities before the numbers are finalised, because they can change both the room count and the cost.

How AA+G helps

AA+G Hospitality Management supports owners and investors of independent luxury and upscale hotels in Italy from feasibility to opening. A senior core team, with more than 50 years of combined experience as hotel operators and owners' representatives, prepares market analysis, concept, development budgets and operating projections on USALI, so that the feasibility figures become the basis of the first operating budget. Specialists are added only when needed, and an AI application developed by AA+G lets us work across more data, with senior analysts checking every result.

Explore our Development and project management service

Hotel feasibility study checklist

  • Define the question the study must answer and the decision it will support
  • Build demand by segment and month, with a competitive set of five to ten hotels
  • Fix the concept: room count, room mix, outlets and service level
  • Prepare a full development budget including FF&E, OS&E, pre opening and contingency
  • Project five to ten years of operations on USALI with a realistic ramp up
  • Run sensitivities on ADR, occupancy, costs and timing
  • Verify planning, permitted use and classification with advisers before finalising
Questions

Frequently asked questions

How long does a hotel feasibility study take?

For a single property, a well structured hotel feasibility study typically takes between four and eight weeks, depending on the availability of building data, the complexity of the concept and whether site visits and meetings with local stakeholders are needed. Rushing the market analysis often leads to optimistic assumptions.

Do banks require a feasibility study?

Most lenders expect an independent study, or at least a projection with transparent assumptions, before financing a development or a conversion. They focus on stabilised GOP, debt service coverage and downside scenarios. A study built on the operating logic of a hotel, rather than on a generic real estate model, is usually more credible in that discussion.

What is the difference between a feasibility study and a business plan?

The feasibility study decides whether, and in what form, the project should go ahead. The business plan comes afterwards and describes how the chosen project will be executed and run: organisation, commercial plan, budgets and timeline. In practice the operating projection of a good hotel feasibility study becomes the backbone of the business plan.

Contact

Testing a hotel project before committing capital?

Talk to AA+G about a feasibility study built on USALI, with assumptions you can defend in front of your bank and your partners.