How much does it cost to convert a building into a hotel?
The cost to convert a building into a hotel depends less on its size than on its condition, its constraints and the concept chosen. A complete budget includes acquisition, design and permits, structural and systems works, FF&E, OS&E, technology, pre opening, financing costs and a contingency. The reliable way to compare options is cost per room, tested against the operating profit the hotel can generate.

What makes up the total cost to convert a building?
Owners often estimate the cost to convert from a contractor's price per square metre and discover later that it covers only part of the investment. A full development budget for a conversion groups costs into a few blocks, each estimated separately and assigned to someone responsible.
- Acquisition and transaction costs, including due diligence, notary fees and taxes
- Design, engineering, project management and permit fees
- Building works: demolition, structure, envelope and finishes
- Mechanical, electrical and plumbing systems, lifts, fire safety and accessibility
- FF&E, OS&E and hotel technology, from the property management system to door locks
- Pre opening costs, working capital and interest during construction
- Contingency, normally higher for an existing building than for new construction
Why is the cost to convert usually higher than expected?
An existing building hides its problems until it is opened up. Structural reinforcement, seismic upgrading, asbestos removal, damp, insufficient floor heights for new ducts, or facades and interiors under heritage protection can all emerge after acquisition. For this reason a contingency of indicatively 10 to 15 per cent of works is prudent in conversions, and it should not be spent on upgrades decided along the way.
The second cause is layout. A hotel needs a regular sequence of rooms with bathrooms, vertical shafts for systems, service lifts, back of house areas, laundry and storage. Buildings designed as offices, palaces or farmhouses rarely offer this. Thick walls, irregular floors and deep plans can mean fewer rooms than hoped, or rooms of very different sizes, which raises cost per room and complicates pricing.
How do you estimate cost per room?
Cost per room, or per key, is the total development cost divided by the number of rooms to be sold. It is the measure lenders, investors and operators use to compare projects. Read it together with gross area per room: upscale boutique hotels typically need in the order of 50 to 80 square metres of gross area per room once corridors, public areas and back of house are included. A building with a lot of unusable space looks cheap per square metre and expensive per room.
The concept drives the cost to convert as much as the building does. Every additional facility, a spa, a pool, event spaces or a restaurant open to the public, adds construction, FF&E, systems and staff. Before fixing the brief, the owner should know which facilities the target guest will actually pay for.
How do you know whether the cost to convert is justified?
The cost to convert is never high or low in absolute terms: it is justified or not by the profit it produces. The test is to compare total cost per room with stabilised EBITDA per room, derived from projected ADR, occupancy and GOP. GOP, gross operating profit, is what remains after departmental and undistributed costs; EBITDA further deducts management fees, insurance, property taxes and a replacement reserve. If the yield on cost falls short of what owner and lenders require, revise the concept or the scope, not the ADR assumption.
It also helps to separate what must be done now from what can be phased. Some rooms or outlets can open in a second stage, financed partly by operating cash flow, provided structure and systems are designed for it from the outset.
Which decisions reduce cost without reducing value?
Most savings are decided before construction starts. Early surveys, a brief fixed before detailed design, a tender on comparable scopes and a procurement plan for FF&E and OS&E protect the budget far more than negotiation once works are under way. Changes during construction are typically the most expensive way to improve a project.
- Commission structural, systems and heritage surveys before signing, where possible
- Fix room count and room mix before detailed design
- Stack bathrooms and wet areas vertically to limit shafts
- Tender works on a detailed specification, not an approximate estimate
How AA+G helps
AA+G Hospitality Management manages greenfield, conversion and renovation projects for owners of independent luxury and upscale hotels in Italy, from feasibility to opening. A senior core team prepares the development, FF&E and OS&E, pre opening and operating budgets, selects and follows contractors and manages handover, so that every cost is tested against the return the hotel can deliver. Specialists are added only when needed.
Before you commit: checking the cost to convert
- Obtain structural, systems and heritage surveys of the building
- Confirm permitted use and classification requirements with your advisers
- Test a room layout to establish the realistic number of keys
- Prepare a full development budget, not only a works estimate
- Set a contingency of indicatively 10 to 15 per cent of works and protect it
- Compare cost per room with projected stabilised EBITDA per room
- Decide which facilities can be phased without redesigning the building
Frequently asked questions
Is it cheaper to convert a building or to build a new hotel?
It depends on the building. The cost to convert can be lower thanks to savings on land, structure and time, and a historic building can support higher rates. However, inefficient layouts, heritage constraints and hidden defects can push cost per room above that of new construction. The comparison should always be made on total cost per room and expected profit, not on works alone.
What share of the budget goes to FF&E and OS&E?
In upscale boutique conversions FF&E and OS&E together often represent a significant share of the total, indicatively in the range of 10 to 20 per cent, depending on the level of finish and the extent of building works. It is frequently underestimated at feasibility stage, so it should be estimated room by room from the outset.
Can public funding reduce the cost of a conversion?
In Italy there are periodically public funding and incentive measures relevant to hotel renovation and energy efficiency, but availability, eligibility and timing change. They should be verified with advisers at the start, because requirements can affect design, procurement and the sequence of works. They should improve returns, not make an unviable project viable.
Planning to convert a building into a hotel?
Talk to AA+G before you commit: we will help you build a complete budget and test it against the profit the hotel can realistically generate.
This guide is for general information only and does not constitute financial, legal or tax advice. Figures are indicative and vary by asset.